{"id":3013,"date":"2026-09-12T00:24:01","date_gmt":"2026-09-12T00:24:01","guid":{"rendered":"https:\/\/sentrimax.com\/centrifuge-balancing\/"},"modified":"2026-09-12T00:24:01","modified_gmt":"2026-09-12T00:24:01","slug":"centrifuge-balancing","status":"publish","type":"page","link":"https:\/\/sentrimax.com\/es\/centrifuge-balancing\/","title":{"rendered":"Centrifuge Balancing Services"},"content":{"rendered":"<p><!-- SX-AIU:START --><\/p>\n<div class=\"sx-content\">\n<nav class=\"sx-crumb\" aria-label=\"Migaja de pan\"><a href=\"\/es\/services\/\">Servicios<\/a> \u203a <span>Centrifuge Balancing Services<\/span><\/nav>\n<p class=\"sx-answer\">Sentrimax balances decanter and tricanter rotating assemblies using three-plane dynamic balancing to ISO G 0.5, a tight grade in the ISO 1940 standard. Balancing happens after repair and reassembly, on the complete bowl, scroll and shaft assembly, and is followed by a test run on every job Sentrimax performs.<\/p>\n<h2>Why balance matters on a decanter or tricanter rotating assembly<\/h2>\n<p>A decanter or tricanter&#8217;s rotating assembly \u2014 the bowl, the internal scroll, and the<br \/>\nshafts connecting them to the gearbox and bearings \u2014 spins at high speed for extended<br \/>\nperiods. Any uneven distribution of mass around that assembly&#8217;s rotating axis creates a<br \/>\ncentrifugal force that rotates with it, showing up as vibration transmitted into the<br \/>\nbearings, seals, and the machine&#8217;s foundation. That vibration is cumulative: it does not<br \/>\ndamage the machine once, it wears bearings and seals continuously for as long as the<br \/>\nimbalance exists. Balancing is the process of measuring where that uneven mass is and<br \/>\nadding or removing weight to cancel it out before the machine goes back into service.<\/p>\n<h2>Two things that define the work: balance grade and plane count<\/h2>\n<p>Two standards govern how balancing is actually done and how tight the result is.<br \/>\nThe first is the ISO G grade, which expresses how much residual unbalance is permitted<br \/>\nfor a given rotor mass and service speed \u2014 our<br \/>\n<a href=\"\/es\/iso-g-0-5-balancing\/\">ISO G 0.5 balancing page<\/a> explains what that grade<br \/>\nmeans and why a tighter grade matters. The second is the number of correction planes used<br \/>\n\u2014 our <a href=\"\/es\/three-plane-dynamic-balancing\/\">three-plane dynamic balancing page<\/a><br \/>\nexplains why a long rotating assembly like a decanter&#8217;s cannot be properly corrected with<br \/>\nfewer than three. Both apply to every rotating assembly Sentrimax balances.<\/p>\n<h2>Where balancing happens in a Sentrimax rebuild<\/h2>\n<p>Balancing is not a separate service booked on its own \u2014 it is stage two of the<br \/>\ndocumented repair process, performed after parts assembly, welding and machining are<br \/>\ncomplete and the rotating assembly has been fully reassembled. Full balancing to ISO<br \/>\nG 0.5 specification happens at this point, followed by a quality control inspection and a<br \/>\nfull test run with a performance report. This sequencing matters: balancing a rotating<br \/>\nassembly before repairs are finished, or before it is fully reassembled in its final<br \/>\nconfiguration, would not reflect how the machine actually runs.<\/p>\n<p>This is one part of Sentrimax&#8217;s broader <a href=\"\/es\/services\/\">centrifuge repair<br \/>\nservices<\/a>, alongside gearbox repair, welding, and machining.<\/p>\n<h2>How unbalance interacts with the gearbox and bearings<\/h2>\n<p>A rotating assembly does not vibrate in isolation from the rest of the machine.<br \/>\nUnbalance-driven vibration transmits into the bearings supporting the bowl and scroll,<br \/>\ninto the seals adjacent to those bearings, and into the gearbox that maintains the<br \/>\ndifferential speed between bowl and scroll. A gearbox rebuilt to<br \/>\ntight tolerances can still wear prematurely if it is reassembled onto a rotating<br \/>\nassembly that was not properly balanced, which is one reason balancing is treated as a<br \/>\nrequired stage in every rebuild rather than an optional add-on requested separately.<\/p>\n<h2>Balancing as part of every job, not an upsell<\/h2>\n<p>Sentrimax&#8217;s documented process includes dynamic balancing and a test run on every job,<br \/>\nalongside a fit evaluation and detailed inspection report. That means a customer sending<br \/>\nin a centrifuge for a bearing replacement, a seal job, or a gearbox rebuild is not<br \/>\nchoosing whether to add balancing as an extra line item \u2014 it is performed as a normal<br \/>\npart of returning the reassembled rotating assembly to service, because any of those<br \/>\nrepairs can change the assembly&#8217;s mass distribution enough to require it.<\/p>\n<h2>What happens if a rotating assembly is reassembled but not properly balanced<\/h2>\n<p>A rotating assembly that is mechanically reassembled correctly but not balanced to<br \/>\nspecification will often run \u2014 at least for a while. The risk is not that it fails to<br \/>\nstart, but that residual vibration accelerates wear in the bearings and seals from the<br \/>\nfirst hour of operation, effectively pre-loading the next round of repairs before the<br \/>\ncurrent one has even proven itself in service. Balancing is what confirms a rebuild is<br \/>\nactually complete, not just reassembled.<\/p>\n<h2>Signs a rotating assembly may be out of balance<\/h2>\n<ul class=\"sx-check\">\n<li><strong>Vibration felt at the bearing housings.<\/strong> A steady vibration that<br \/>\ntracks with running speed, rather than an intermittent knock, is the classic signature<br \/>\nof an unbalance condition rather than a bearing defect frequency.<\/li>\n<li><strong>Noise or vibration that changes with speed.<\/strong> Unbalance-driven<br \/>\nvibration typically scales with rotating speed in a predictable way; a change that<br \/>\ndoes not follow that pattern points elsewhere.<\/li>\n<li><strong>Premature bearing or seal wear with no other obvious cause.<\/strong> If<br \/>\nbearings or seals are failing faster than expected and nothing else in the machine<br \/>\nexplains it, unbalance is a reasonable line of investigation.<\/li>\n<li><strong>Vibration that appeared after a repair or component change.<\/strong> Any<br \/>\nwork that changes the rotating assembly&#8217;s mass distribution \u2014 a replaced gearbox,<br \/>\nbearing or bowl component \u2014 can introduce unbalance if the assembly was not re-balanced<br \/>\nafterward.<\/li>\n<\/ul>\n<h2>The engineering services machine shop behind the balance work<\/h2>\n<p>Achieving a specific balance grade sometimes requires more than adding or removing a<br \/>\ncorrection weight \u2014 a shaft may need re-machining to correct a mounting surface, or a<br \/>\ncorrection may call for a custom-fabricated weight to fit a specific plane on the<br \/>\nassembly. Sentrimax&#8217;s engineering services and machine shop capability \u2014 milling,<br \/>\nlathe-turning and precision-grinding \u2014 supports the balancing process itself when the<br \/>\nassembly&#8217;s geometry calls for it, rather than treating balancing as a bolt-on step<br \/>\ndisconnected from the rest of the repair.<\/p>\n<h2>Balancing across all serviced brands<\/h2>\n<p>Balancing is not brand-specific. Sentrimax balances rotating assemblies from<br \/>\nSharples, Flottweg, Centrisys, Derrick, GEA, Alfa Laval, Tomoe, Andritz, Bird, Pieralisi<br \/>\nand other manufacturers&#8217; decanter and tricanter centrifuges to the same ISO G 0.5<br \/>\nspecification, as an independent MRO provider not affiliated with, authorized by, or<br \/>\nendorsed by any of these manufacturers.<\/p>\n<h2>What you receive with a balanced rotating assembly<\/h2>\n<p>Every job Sentrimax completes includes a fit evaluation, a detailed inspection report,<br \/>\ndynamic balancing, and a test run \u2014 balancing and the report that documents it are<br \/>\nstandard, not an upsell. The balance work itself is verified through a three-plane<br \/>\ndynamic balancing process to ISO G 0.5, and the test run confirms the balanced assembly<br \/>\nperforms correctly under actual running conditions before the unit ships.<\/p>\n<h2>Balancing across the equipment Sentrimax services<\/h2>\n<p>The same ISO G 0.5, three-plane balancing approach applies across the 8 to 43 inch<br \/>\nbowl diameter range of decanter, tricanter and disc stack centrifuges Sentrimax<br \/>\nservices, and across the major brands it works on \u2014 Sharples, Flottweg, Centrisys,<br \/>\nDerrick, GEA, Alfa Laval, Tomoe, Andritz, Bird, Pieralisi and others. The balancing<br \/>\nprocess does not change based on brand; it changes based on the physical geometry and<br \/>\nmass distribution of the specific rotating assembly in front of the technician.<\/p>\n<h2>When balancing is requested on its own<\/h2>\n<p>Not every balancing job originates from a full rebuild. A rotating assembly that has<br \/>\nhad a component replaced elsewhere, or one where vibration has developed without an<br \/>\nobvious mechanical cause, can be sent in specifically for balance evaluation and<br \/>\ncorrection. The same inspection-first approach applies: the assembly is measured before<br \/>\nany correction weight is added, so the actual unbalance condition is documented rather<br \/>\nthan assumed.<\/p>\n<h2>Why the inspection report references balance condition even before repair<\/h2>\n<p>The initial inspection at receipt notes visible indicators relevant to balance<br \/>\ncondition \u2014 uneven wear patterns, buildup on the bowl or scroll, or damage that would<br \/>\nshift mass distribution \u2014 even before any repair work is approved. This gives an early<br \/>\nread on whether balancing is likely to be a straightforward correction or a more<br \/>\ninvolved one once the assembly is fully disassembled, and it is documented in the same<br \/>\ninspection report that covers the rest of the machine&#8217;s condition.<\/p>\n<h2>How balancing fits alongside welding, fabrication and controls work<\/h2>\n<p>A rotating assembly rarely arrives needing only balancing. It is common for a job to<br \/>\ncombine welding and fabrication to correct wear or damage on the bowl or scroll,<br \/>\nmachining to bring components back to tolerance, and controls work if a VFD or PLC issue<br \/>\ncontributed to the problem, alongside the balancing itself. Balancing is sequenced after<br \/>\nthat other work is complete, since it corrects the assembly in the exact configuration it<br \/>\nwill actually run in \u2014 not a configuration that will change again once other repairs are<br \/>\nfinished.<\/p>\n<h2>What to describe when you contact us about vibration or balance concerns<\/h2>\n<p>If vibration is what brought you to this page, a useful starting description includes<br \/>\nwhen the vibration started, whether it changes with running speed, whether it appeared<br \/>\nafter any other repair or component change, and whether it is localized to one area of<br \/>\nthe machine or general. That context, combined with a physical inspection, is what<br \/>\ndetermines whether the issue is genuinely a balance condition or something else<br \/>\nentirely, such as a bearing defect or a mounting issue unrelated to the rotating<br \/>\nassembly&#8217;s mass distribution.<\/p>\n<h2>Request balanced rotating assembly work<\/h2>\n<p>Whether you need a full rotating assembly rebuild or a standalone balance check on an<br \/>\nassembly you already have, tell us about your centrifuge and what you are seeing.<\/p>\n<section class=\"sx-faq\">\n<h2>Preguntas frecuentes<\/h2>\n<details>\n<summary>Is dynamic balancing included in every Sentrimax repair, or is it a separate charge?<\/summary>\n<div class=\"sx-faq-a\">\n<p>Dynamic balancing and a test run are included on every job Sentrimax performs, along with a fit evaluation and a detailed inspection report. It is not an optional add-on quoted separately from the repair itself.<\/p>\n<\/div>\n<\/details>\n<details>\n<summary>Can a rotating assembly be balanced without a full rebuild?<\/summary>\n<div class=\"sx-faq-a\">\n<p>Balancing is normally performed as part of stage two of the repair process, after any needed parts work is complete and the assembly is in its final reassembled configuration. Whether a standalone balance check makes sense without other repair work depends on the assembly&#039;s condition, which inspection would confirm.<\/p>\n<\/div>\n<\/details>\n<details>\n<summary>What is the difference between ISO G 0.5 and three-plane balancing?<\/summary>\n<div class=\"sx-faq-a\">\n<p>ISO G 0.5 describes how tight the final result has to be \u2014 the permissible residual unbalance for the rotor&#039;s mass and speed. Three-plane balancing describes the method used to get there \u2014 correcting unbalance at three points along the assembly rather than one or two, which a long rotor requires.<\/p>\n<\/div>\n<\/details>\n<details>\n<summary>Does balancing get redone if a gearbox or bearing is later replaced?<\/summary>\n<div class=\"sx-faq-a\">\n<p>Yes. Any change to the rotating assembly&#039;s mass distribution \u2014 including a gearbox, bearing or bowl component replacement \u2014 changes the balance condition, so balancing is performed again on the reassembled unit as part of that repair, not skipped because it was done previously.<\/p>\n<\/div>\n<\/details>\n<details>\n<summary>How is balance verified before the centrifuge ships?<\/summary>\n<div class=\"sx-faq-a\">\n<p>After dynamic balancing, the assembled centrifuge goes through a quality control inspection and a full test run that produces a performance report, confirming the balanced assembly runs correctly under actual operating conditions rather than relying on the balance measurement alone.<\/p>\n<\/div>\n<\/details>\n<\/section>\n<section class=\"sx-cta\">\n<h2>Hable con un especialista en centr\u00edfugas.<\/h2>\n<p>Env\u00edenos los detalles de la m\u00e1quina y le enviaremos un informe de inspecci\u00f3n y un presupuesto.<\/p>\n<p><a class=\"sx-btn\" href=\"\/es\/contact\/\">Solicitar presupuesto<\/a><\/section>\n<\/div>\n<p><!-- SX-AIU:END --><\/p>","protected":false},"excerpt":{"rendered":"<p>Sentrimax balances decanter and tricanter rotating assemblies using three-plane dynamic balancing to ISO G 0.5, a tight grade in the ISO 1940 standard. Balancing happens after repair and reassembly, on the complete bowl, scroll and shaft assembly, and is followed by a test run on every job Sentrimax performs.<\/p>","protected":false},"author":10,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"class_list":["post-3013","page","type-page","status-publish","hentry"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.1.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Sentrimax balances decanter and tricanter rotating assemblies with three-plane dynamic balancing to ISO G 0.5, included standard on every repair job it runs.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/sentrimax.com\/es\/centrifuge-balancing\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"es_ES\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Sentrimax Centrifuges -\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Centrifuge Balancing Services | Sentrimax\" \/>\n\t\t<meta property=\"og:description\" content=\"Sentrimax balances decanter and tricanter rotating assemblies with three-plane dynamic balancing to ISO G 0.5, included standard on every repair job it runs.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/sentrimax.com\/es\/centrifuge-balancing\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/sentrimax.com\/wp-content\/uploads\/2025\/05\/Group-1-1.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/sentrimax.com\/wp-content\/uploads\/2025\/05\/Group-1-1.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"384\" \/>\n\t\t<meta property=\"og:image:height\" content=\"128\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-09-12T00:24:01+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-09-12T00:24:01+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Centrifuge Balancing Services | Sentrimax\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Sentrimax balances decanter and tricanter rotating assemblies with three-plane dynamic balancing to ISO G 0.5, included standard on every repair job it runs.\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/sentrimax.com\/wp-content\/uploads\/2025\/05\/Group-1-1.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/centrifuge-balancing\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/sentrimax.com\\\/es\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/centrifuge-balancing\\\/#listItem\",\"name\":\"Centrifuge Balancing Services\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/centrifuge-balancing\\\/#listItem\",\"position\":2,\"name\":\"Centrifuge Balancing Services\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es#listItem\",\"name\":\"Home\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/#organization\",\"name\":\"Sentrimax Centrifuges\",\"url\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/sentrimax.com\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/Group-1-1.png\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/centrifuge-balancing\\\/#organizationLogo\",\"width\":384,\"height\":128},\"image\":{\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/centrifuge-balancing\\\/#organizationLogo\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/centrifuge-balancing\\\/#webpage\",\"url\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/centrifuge-balancing\\\/\",\"name\":\"Centrifuge Balancing Services | Sentrimax\",\"description\":\"Sentrimax balances decanter and tricanter rotating assemblies with three-plane dynamic balancing to ISO G 0.5, included standard on every repair job it runs.\",\"inLanguage\":\"es-ES\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/centrifuge-balancing\\\/#breadcrumblist\"},\"datePublished\":\"2026-09-12T00:24:01+00:00\",\"dateModified\":\"2026-09-12T00:24:01+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/\",\"name\":\"Sentrimax Centrifuges\",\"inLanguage\":\"es-ES\",\"publisher\":{\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Centrifuge Balancing Services | Sentrimax","description":"Sentrimax balances decanter and tricanter rotating assemblies with three-plane dynamic balancing to ISO G 0.5, included standard on every repair job it runs.","canonical_url":"https:\/\/sentrimax.com\/es\/centrifuge-balancing\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BreadcrumbList","@id":"https:\/\/sentrimax.com\/es\/centrifuge-balancing\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/sentrimax.com\/es#listItem","position":1,"name":"Home","item":"https:\/\/sentrimax.com\/es","nextItem":{"@type":"ListItem","@id":"https:\/\/sentrimax.com\/es\/centrifuge-balancing\/#listItem","name":"Centrifuge Balancing Services"}},{"@type":"ListItem","@id":"https:\/\/sentrimax.com\/es\/centrifuge-balancing\/#listItem","position":2,"name":"Centrifuge Balancing Services","previousItem":{"@type":"ListItem","@id":"https:\/\/sentrimax.com\/es#listItem","name":"Home"}}]},{"@type":"Organization","@id":"https:\/\/sentrimax.com\/es\/#organization","name":"Sentrimax Centrifuges","url":"https:\/\/sentrimax.com\/es\/","logo":{"@type":"ImageObject","url":"https:\/\/sentrimax.com\/wp-content\/uploads\/2025\/05\/Group-1-1.png","@id":"https:\/\/sentrimax.com\/es\/centrifuge-balancing\/#organizationLogo","width":384,"height":128},"image":{"@id":"https:\/\/sentrimax.com\/es\/centrifuge-balancing\/#organizationLogo"}},{"@type":"WebPage","@id":"https:\/\/sentrimax.com\/es\/centrifuge-balancing\/#webpage","url":"https:\/\/sentrimax.com\/es\/centrifuge-balancing\/","name":"Centrifuge Balancing Services | Sentrimax","description":"Sentrimax balances decanter and tricanter rotating assemblies with three-plane dynamic balancing to ISO G 0.5, included standard on every repair job it runs.","inLanguage":"es-ES","isPartOf":{"@id":"https:\/\/sentrimax.com\/es\/#website"},"breadcrumb":{"@id":"https:\/\/sentrimax.com\/es\/centrifuge-balancing\/#breadcrumblist"},"datePublished":"2026-09-12T00:24:01+00:00","dateModified":"2026-09-12T00:24:01+00:00"},{"@type":"WebSite","@id":"https:\/\/sentrimax.com\/es\/#website","url":"https:\/\/sentrimax.com\/es\/","name":"Sentrimax Centrifuges","inLanguage":"es-ES","publisher":{"@id":"https:\/\/sentrimax.com\/es\/#organization"}}]},"og:locale":"es_ES","og:site_name":"Sentrimax Centrifuges -","og:type":"article","og:title":"Centrifuge Balancing Services | Sentrimax","og:description":"Sentrimax balances decanter and tricanter rotating assemblies with three-plane dynamic balancing to ISO G 0.5, included standard on every repair job it runs.","og:url":"https:\/\/sentrimax.com\/es\/centrifuge-balancing\/","og:image":"https:\/\/sentrimax.com\/wp-content\/uploads\/2025\/05\/Group-1-1.png","og:image:secure_url":"https:\/\/sentrimax.com\/wp-content\/uploads\/2025\/05\/Group-1-1.png","og:image:width":384,"og:image:height":128,"article:published_time":"2026-09-12T00:24:01+00:00","article:modified_time":"2026-09-12T00:24:01+00:00","twitter:card":"summary_large_image","twitter:title":"Centrifuge Balancing Services | Sentrimax","twitter:description":"Sentrimax balances decanter and tricanter rotating assemblies with three-plane dynamic balancing to ISO G 0.5, included standard on every repair job it runs.","twitter:image":"https:\/\/sentrimax.com\/wp-content\/uploads\/2025\/05\/Group-1-1.png"},"aioseo_meta_data":{"post_id":"3013","title":"Centrifuge Balancing Services | Sentrimax","description":"Sentrimax balances decanter and tricanter rotating assemblies with three-plane dynamic balancing to ISO G 0.5, included standard on every repair job it runs.","keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":null,"twitter_description":null,"schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"WebPage","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null,"created":"2026-09-12 00:24:02","updated":"2026-09-12 00:31:06","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/sentrimax.com\/es\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tCentrifuge Balancing Services\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/sentrimax.com\/es"},{"label":"Centrifuge Balancing Services","link":"https:\/\/sentrimax.com\/es\/centrifuge-balancing\/"}],"_links":{"self":[{"href":"https:\/\/sentrimax.com\/es\/wp-json\/wp\/v2\/pages\/3013","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sentrimax.com\/es\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/sentrimax.com\/es\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/sentrimax.com\/es\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/sentrimax.com\/es\/wp-json\/wp\/v2\/comments?post=3013"}],"version-history":[{"count":0,"href":"https:\/\/sentrimax.com\/es\/wp-json\/wp\/v2\/pages\/3013\/revisions"}],"wp:attachment":[{"href":"https:\/\/sentrimax.com\/es\/wp-json\/wp\/v2\/media?parent=3013"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}