{"id":3034,"date":"2026-09-12T00:24:02","date_gmt":"2026-09-12T00:24:02","guid":{"rendered":"https:\/\/sentrimax.com\/centrifuge-mobilization\/"},"modified":"2026-09-12T00:24:02","modified_gmt":"2026-09-12T00:24:02","slug":"centrifuge-mobilization","status":"publish","type":"page","link":"https:\/\/sentrimax.com\/es\/centrifuge-mobilization\/","title":{"rendered":"What Does Centrifuge Mobilisation Involve?"},"content":{"rendered":"<p><!-- SX-AIU:START --><\/p>\n<div class=\"sx-content\">\n<nav class=\"sx-crumb\" aria-label=\"Migaja de pan\"><a href=\"\/es\/rentals\/\">Centrifuge Rentals<\/a> \u203a <span>What Does Centrifuge Mobilisation Involve?<\/span><\/nav>\n<p class=\"sx-answer\">Mobilizing a centrifuge to site means confirming five things before the unit arrives: available power, a footprint that fits the trailer, skid or container, feed and discharge connections, containment for spills and washdown, and control integration with existing site systems. Sentrimax works through this checklist for every deployment before startup.<\/p>\n<h2>Mobilization Is a Site-Readiness Problem<\/h2>\n<p>Getting a trailer, skid or container-mounted centrifuge to a location is the easy part. Getting it running once it arrives depends on whether the site has done the preparation ahead of time. Sentrimax works through the same five categories on every mobilization: power, footprint, feed and discharge, containment, and controls. Gaps in any one of them turn what should be a quick connection into an extended delay.<\/p>\n<h2>Power<\/h2>\n<p>A centrifuge, its feed pump, and any polymer system or conveyor draw a specific voltage, phase and amperage that has to be confirmed against what the site can actually deliver at the deployment location, not just what the site has somewhere on the property. Distance from the nearest suitable panel or generator affects cable sizing and voltage drop. Where site power is not available or not sufficient, a generator has to be sized and positioned as part of the same plan, not arranged after the unit shows up.<\/p>\n<p>Power quality matters as much as raw capacity. A generator or a remote panel tap can deliver acceptable voltage under light load and sag noticeably once the centrifuge, feed pump and conveyor are all drawing current together. Confirming expected load against the source&#8217;s actual capacity, not just its rated capacity, avoids a startup where everything looks fine until the full package is running at once.<\/p>\n<h2>Footprint<\/h2>\n<p>Trailer, skid and container configurations each have a physical footprint, and that footprint has to account for more than the unit itself: access for the delivery vehicle or crane, clearance for maintenance access on all sides, and room for ancillary equipment like a polymer skid or a solids conveyor discharge. Ground conditions matter too; a trailer needs a level, stable surface, and a skid or container being craned into place needs confirmed load-bearing capacity underneath it. A footprint check should also include overhead clearance for the crane or delivery vehicle itself, which is easy to overlook when the survey focuses only on the ground-level layout.<\/p>\n<h2>Feed and Discharge<\/h2>\n<p>The centrifuge has to connect to whatever it is separating on one end and to wherever the separated liquid and solids go on the other. That means confirming pipe or hose sizing and material compatibility, pump capacity if the site is not gravity-feeding the unit, and a discharge point, whether a tank, a truck, a bin, or a conveyor, that can actually receive the volume the unit will produce. A unit sized correctly for the process but connected with undersized feed piping will underperform regardless of its own condition.<\/p>\n<p>Distance between the feed source and the unit, and between the unit and its discharge point, also affects pump selection and piping runs in ways that are easy to underestimate from a distance. A site plan that shows the centrifuge positioned fifty feet from the nearest feed tank has a very different pumping requirement than one positioned adjacent to it, and that distance should be measured during the survey rather than estimated afterward.<\/p>\n<h2>Containment<\/h2>\n<p>Spill and washdown containment around a mobilized unit is not optional, particularly where the process fluid is regulated. Trailer and skid units typically need secondary containment built into the site plan rather than assumed to exist; container-based layouts can build containment into the container itself, which is one of the reasons a site chooses that configuration in the first place. Containment planning also has to account for washdown water and any residual material left in lines when the unit is eventually demobilized.<\/p>\n<h2>Controles<\/h2>\n<p>The mobilized unit&#8217;s own control panel handles its internal process, but it usually also needs to talk to the site: an interlock with an upstream pump, a level signal from a receiving tank, or integration into the site&#8217;s existing monitoring system. Confirming what signals need to pass between the mobilized unit and existing site controls, and what wiring or connection that requires, is part of mobilization planning rather than something worked out after the unit is running.<\/p>\n<p>Where the mobilized unit needs to shut down automatically in response to a site condition, a high level in a receiving tank, for instance, that interlock has to be tested during commissioning, not assumed to work because the wiring diagram says it should. A signal that is correctly drawn on paper but incorrectly terminated in the field behaves identically to no interlock at all until it is actually exercised.<\/p>\n<ul class=\"sx-check\">\n<li>Voltage, phase and amperage confirmed at the actual deployment point, not just on-site generally<\/li>\n<li>Footprint checked against delivery access, maintenance clearance and ground load-bearing capacity<\/li>\n<li>Feed and discharge piping sized and material-matched to the process<\/li>\n<li>Secondary containment planned for spills and washdown<\/li>\n<li>Control signals and interlocks with existing site systems identified<\/li>\n<\/ul>\n<h2>A Typical Mobilization Sequence<\/h2>\n<ol class=\"sx-steps\">\n<li><strong>Site survey.<\/strong> Power, footprint, access and existing piping and controls are reviewed against the process the unit needs to handle.<\/li>\n<li><strong>Configuration confirmed.<\/strong> Trailer, skid or container mounting is selected based on the survey findings and the deployment length.<\/li>\n<li><strong>Unit delivered and positioned.<\/strong> The centrifuge package is transported and set at the surveyed location.<\/li>\n<li><strong>Connections made.<\/strong> Power, feed, discharge, containment and control connections are completed and tested.<\/li>\n<li><strong>Startup and handover.<\/strong> The unit is started, checked against expected performance, and handed to site operators.<\/li>\n<\/ol>\n<h2>What Happens When a Site Isn&#8217;t Ready<\/h2>\n<p>The most common source of delay in a mobilization is not the centrifuge itself; it is a mismatch discovered on arrival, insufficient power at the deployment point, a footprint that does not actually clear an access route, or a discharge point that cannot handle the volume. A site survey done before delivery, rather than assumptions made from a floor plan or a phone description, is what prevents this.<\/p>\n<h2>Mobilizing a Rental Versus Your Own Unit<\/h2>\n<p>Everything above applies equally to a Sentrimax rental unit brought in to cover a repair and to a customer-owned centrifuge being relocated to a new site. If the reason for mobilizing is to keep a process running while your own centrifuge is repaired, <a href=\"\/es\/rent-vs-repair-centrifuge\/\">renting a centrifuge instead of waiting on a repair<\/a> covers how that decision gets made.<\/p>\n<h2>Choosing the Right Mounting Configuration<\/h2>\n<p>Which of the five readiness categories matters most depends heavily on whether the deployment is trailer, skid or container-mounted. <a href=\"\/es\/mobile-centrifuge-rental\/\">Trailer and skid-mounted centrifuge systems<\/a> compares these configurations and the site conditions each one suits, which is worth reviewing before finalizing a site survey.<\/p>\n<h2>Starting a Mobilization Plan<\/h2>\n<p>A site sketch or plot plan, available power data, and a description of the process feeding the unit are enough for Sentrimax&#8217;s <a href=\"\/es\/rentals\/\">centrifuge rental<\/a> and mobilization team to begin a survey and confirm what needs to be in place before delivery.<\/p>\n<h2>Preparing for the Site Survey<\/h2>\n<p>A survey moves faster when the site can answer a few questions ahead of time: the voltage and phase available at or near the intended deployment point, an approximate site plan or plot drawing, the location of the nearest suitable feed source and discharge point, any permit or environmental condition that governs containment on site, and the name of whoever will need to sign off on the control integration with existing systems. None of this needs to be exact before the survey happens, but having a rough answer to each ready speeds up the process considerably compared to beginning the survey with nothing prepared.<\/p>\n<h2>Common Mobilization Mistakes<\/h2>\n<p>The same handful of mistakes account for most mobilization delays. Assuming site power is sufficient without confirming voltage drop under full load. Measuring footprint against the unit&#8217;s dimensions alone without accounting for delivery and maintenance access. Treating containment as something that can be arranged after the unit arrives rather than planned alongside it. And leaving control integration undiscussed until commissioning, when it is far more expensive to correct. A site survey done properly before delivery catches all four before they become a problem on the day the unit shows up.<\/p>\n<h2>How This Ties Back to the Mounting Decision<\/h2>\n<p>The five readiness categories are not independent of which mounting configuration is chosen. A container layout can fold containment into the unit itself, easing that part of the survey, while a trailer typically shifts more of the containment burden onto the site plan. A skid&#8217;s larger footprint can accommodate a longer solids conveyor run than a trailer, which changes the discharge point the site needs to prepare for. Working through mounting configuration and site readiness together, rather than choosing a configuration first and discovering the readiness gaps afterward, is what keeps a mobilization on schedule. A survey that treats these as two separate steps, configuration first and readiness second, is more likely to end up revisiting the configuration once readiness gaps are discovered, which is exactly the rework a combined review is meant to avoid.<\/p>\n<h2>Who Should Be Involved in the Survey<\/h2>\n<p>A useful site survey usually draws on more than one person&#8217;s knowledge: whoever manages site electrical infrastructure for the power assessment, whoever oversees the process for feed and discharge specifics, and whoever handles environmental or safety compliance for the containment plan. Involving these perspectives during the survey rather than after it avoids a plan that looks complete on paper but is missing a constraint only one department was aware of.<\/p>\n<section class=\"sx-faq\">\n<h2>Preguntas frecuentes<\/h2>\n<details>\n<summary>How far in advance should a site survey happen before mobilization?<\/summary>\n<div class=\"sx-faq-a\">\n<p>As early as the deployment is being planned, ideally before a delivery date is committed to. A survey done early leaves time to resolve a power shortfall, a footprint conflict, or a containment gap without it becoming a delay once the unit is already scheduled to arrive.<\/p>\n<\/div>\n<\/details>\n<details>\n<summary>Can Sentrimax size a generator if site power isn&#039;t sufficient?<\/summary>\n<div class=\"sx-faq-a\">\n<p>Generator sizing is worked out as part of the power assessment during the site survey, based on the voltage, phase and amperage the centrifuge package requires. This is planned before delivery rather than resolved after the unit arrives and cannot be powered.<\/p>\n<\/div>\n<\/details>\n<details>\n<summary>What happens to containment requirements when the unit is demobilized?<\/summary>\n<div class=\"sx-faq-a\">\n<p>Demobilization includes accounting for residual material left in feed and discharge lines and cleaning up washdown water generated during shutdown, which should be planned as part of the original containment design rather than handled as an afterthought.<\/p>\n<\/div>\n<\/details>\n<details>\n<summary>Does a container-based layout still need a separate containment plan?<\/summary>\n<div class=\"sx-faq-a\">\n<p>Often less of one, since containment can be built into the container itself, but a site should still confirm how contained fluid is captured and removed rather than assuming the container alone eliminates the need for a spill response plan.<\/p>\n<\/div>\n<\/details>\n<details>\n<summary>Can control integration be added after a unit is already running?<\/summary>\n<div class=\"sx-faq-a\">\n<p>It can, but it is more disruptive that way, since adding an interlock or a signal connection later may require a brief shutdown. Identifying control integration needs during the site survey avoids that interruption once the unit is operating.<\/p>\n<\/div>\n<\/details>\n<\/section>\n<section class=\"sx-cta\">\n<h2>Hable con un especialista en centr\u00edfugas.<\/h2>\n<p>Env\u00edenos los detalles de la m\u00e1quina y le enviaremos un informe de inspecci\u00f3n y un presupuesto.<\/p>\n<p><a class=\"sx-btn\" href=\"\/es\/rentals\/\">Plan a site mobilisation<\/a><\/section>\n<\/div>\n<p><!-- SX-AIU:END --><\/p>","protected":false},"excerpt":{"rendered":"<p>Mobilizing a centrifuge to site means confirming five things before the unit arrives: available power, a footprint that fits the trailer, skid or container, feed and discharge connections, containment for spills and washdown, and control integration with existing site systems. Sentrimax works through this checklist for every deployment before startup.<\/p>","protected":false},"author":10,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"class_list":["post-3034","page","type-page","status-publish","hentry"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.1.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Power, footprint, feed and discharge, containment and controls are the five checks Sentrimax runs before any mobilized centrifuge can safely start up.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/sentrimax.com\/es\/centrifuge-mobilization\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"es_ES\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Sentrimax Centrifuges -\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"What Centrifuge Mobilization Involves | Sentrimax\" \/>\n\t\t<meta property=\"og:description\" content=\"Power, footprint, feed and discharge, containment and controls are the five checks Sentrimax runs before any mobilized centrifuge can safely start up.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/sentrimax.com\/es\/centrifuge-mobilization\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/sentrimax.com\/wp-content\/uploads\/2025\/05\/Group-1-1.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/sentrimax.com\/wp-content\/uploads\/2025\/05\/Group-1-1.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"384\" \/>\n\t\t<meta property=\"og:image:height\" content=\"128\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-09-12T00:24:02+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-09-12T00:24:02+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"What Centrifuge Mobilization Involves | Sentrimax\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Power, footprint, feed and discharge, containment and controls are the five checks Sentrimax runs before any mobilized centrifuge can safely start up.\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/sentrimax.com\/wp-content\/uploads\/2025\/05\/Group-1-1.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/centrifuge-mobilization\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/sentrimax.com\\\/es\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/centrifuge-mobilization\\\/#listItem\",\"name\":\"What Does Centrifuge Mobilisation Involve?\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/centrifuge-mobilization\\\/#listItem\",\"position\":2,\"name\":\"What Does Centrifuge Mobilisation Involve?\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es#listItem\",\"name\":\"Home\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/#organization\",\"name\":\"Sentrimax Centrifuges\",\"url\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/sentrimax.com\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/Group-1-1.png\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/centrifuge-mobilization\\\/#organizationLogo\",\"width\":384,\"height\":128},\"image\":{\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/centrifuge-mobilization\\\/#organizationLogo\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/centrifuge-mobilization\\\/#webpage\",\"url\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/centrifuge-mobilization\\\/\",\"name\":\"What Centrifuge Mobilization Involves | Sentrimax\",\"description\":\"Power, footprint, feed and discharge, containment and controls are the five checks Sentrimax runs before any mobilized centrifuge can safely start up.\",\"inLanguage\":\"es-ES\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/centrifuge-mobilization\\\/#breadcrumblist\"},\"datePublished\":\"2026-09-12T00:24:02+00:00\",\"dateModified\":\"2026-09-12T00:24:02+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/\",\"name\":\"Sentrimax Centrifuges\",\"inLanguage\":\"es-ES\",\"publisher\":{\"@id\":\"https:\\\/\\\/sentrimax.com\\\/es\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"What Centrifuge Mobilization Involves | Sentrimax","description":"Power, footprint, feed and discharge, containment and controls are the five checks Sentrimax runs before any mobilized centrifuge can safely start up.","canonical_url":"https:\/\/sentrimax.com\/es\/centrifuge-mobilization\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BreadcrumbList","@id":"https:\/\/sentrimax.com\/es\/centrifuge-mobilization\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/sentrimax.com\/es#listItem","position":1,"name":"Home","item":"https:\/\/sentrimax.com\/es","nextItem":{"@type":"ListItem","@id":"https:\/\/sentrimax.com\/es\/centrifuge-mobilization\/#listItem","name":"What Does Centrifuge Mobilisation Involve?"}},{"@type":"ListItem","@id":"https:\/\/sentrimax.com\/es\/centrifuge-mobilization\/#listItem","position":2,"name":"What Does Centrifuge Mobilisation Involve?","previousItem":{"@type":"ListItem","@id":"https:\/\/sentrimax.com\/es#listItem","name":"Home"}}]},{"@type":"Organization","@id":"https:\/\/sentrimax.com\/es\/#organization","name":"Sentrimax Centrifuges","url":"https:\/\/sentrimax.com\/es\/","logo":{"@type":"ImageObject","url":"https:\/\/sentrimax.com\/wp-content\/uploads\/2025\/05\/Group-1-1.png","@id":"https:\/\/sentrimax.com\/es\/centrifuge-mobilization\/#organizationLogo","width":384,"height":128},"image":{"@id":"https:\/\/sentrimax.com\/es\/centrifuge-mobilization\/#organizationLogo"}},{"@type":"WebPage","@id":"https:\/\/sentrimax.com\/es\/centrifuge-mobilization\/#webpage","url":"https:\/\/sentrimax.com\/es\/centrifuge-mobilization\/","name":"What Centrifuge Mobilization Involves | Sentrimax","description":"Power, footprint, feed and discharge, containment and controls are the five checks Sentrimax runs before any mobilized centrifuge can safely start up.","inLanguage":"es-ES","isPartOf":{"@id":"https:\/\/sentrimax.com\/es\/#website"},"breadcrumb":{"@id":"https:\/\/sentrimax.com\/es\/centrifuge-mobilization\/#breadcrumblist"},"datePublished":"2026-09-12T00:24:02+00:00","dateModified":"2026-09-12T00:24:02+00:00"},{"@type":"WebSite","@id":"https:\/\/sentrimax.com\/es\/#website","url":"https:\/\/sentrimax.com\/es\/","name":"Sentrimax Centrifuges","inLanguage":"es-ES","publisher":{"@id":"https:\/\/sentrimax.com\/es\/#organization"}}]},"og:locale":"es_ES","og:site_name":"Sentrimax Centrifuges -","og:type":"article","og:title":"What Centrifuge Mobilization Involves | Sentrimax","og:description":"Power, footprint, feed and discharge, containment and controls are the five checks Sentrimax runs before any mobilized centrifuge can safely start up.","og:url":"https:\/\/sentrimax.com\/es\/centrifuge-mobilization\/","og:image":"https:\/\/sentrimax.com\/wp-content\/uploads\/2025\/05\/Group-1-1.png","og:image:secure_url":"https:\/\/sentrimax.com\/wp-content\/uploads\/2025\/05\/Group-1-1.png","og:image:width":384,"og:image:height":128,"article:published_time":"2026-09-12T00:24:02+00:00","article:modified_time":"2026-09-12T00:24:02+00:00","twitter:card":"summary_large_image","twitter:title":"What Centrifuge Mobilization Involves | Sentrimax","twitter:description":"Power, footprint, feed and discharge, containment and controls are the five checks Sentrimax runs before any mobilized centrifuge can safely start up.","twitter:image":"https:\/\/sentrimax.com\/wp-content\/uploads\/2025\/05\/Group-1-1.png"},"aioseo_meta_data":{"post_id":"3034","title":"What Centrifuge Mobilization Involves | Sentrimax","description":"Power, footprint, feed and discharge, containment and controls are the five checks Sentrimax runs before any mobilized centrifuge can safely start up.","keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":null,"twitter_description":null,"schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"WebPage","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null,"created":"2026-09-12 00:24:02","updated":"2026-09-12 00:34:05","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/sentrimax.com\/es\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tWhat Does Centrifuge Mobilisation Involve?\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/sentrimax.com\/es"},{"label":"What Does Centrifuge Mobilisation Involve?","link":"https:\/\/sentrimax.com\/es\/centrifuge-mobilization\/"}],"_links":{"self":[{"href":"https:\/\/sentrimax.com\/es\/wp-json\/wp\/v2\/pages\/3034","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sentrimax.com\/es\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/sentrimax.com\/es\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/sentrimax.com\/es\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/sentrimax.com\/es\/wp-json\/wp\/v2\/comments?post=3034"}],"version-history":[{"count":0,"href":"https:\/\/sentrimax.com\/es\/wp-json\/wp\/v2\/pages\/3034\/revisions"}],"wp:attachment":[{"href":"https:\/\/sentrimax.com\/es\/wp-json\/wp\/v2\/media?parent=3034"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}