{"id":3029,"date":"2026-09-12T00:24:02","date_gmt":"2026-09-12T00:24:02","guid":{"rendered":"https:\/\/sentrimax.com\/centrifuge-control-panel-upgrade\/"},"modified":"2026-09-12T00:24:02","modified_gmt":"2026-09-12T00:24:02","slug":"centrifuge-control-panel-upgrade","status":"publish","type":"page","link":"https:\/\/sentrimax.com\/fr\/centrifuge-control-panel-upgrade\/","title":{"rendered":"When Should a Centrifuge Control Panel Be Upgraded?"},"content":{"rendered":"<p><!-- SX-AIU:START --><\/p>\n<div class=\"sx-content\">\n<nav class=\"sx-crumb\" aria-label=\"chapelure\"><a href=\"\/fr\/centrifuge-controls-automation\/\">Commandes et automatisation des centrifugeuses<\/a> \u203a <span>When Should a Centrifuge Control Panel Be Upgraded?<\/span><\/nav>\n<p class=\"sx-answer\">Upgrade a centrifuge control panel when the PLC or HMI platform is obsolete, replacement parts are hard to source, the panel lacks safety interlocks a current process needs, or it cannot capture the process data your team relies on. Sentrimax evaluates existing panels against these four triggers before recommending a PLC, HMI or VFD upgrade.<\/p>\n<h2>Four Triggers, Not a Fixed Age<\/h2>\n<p>There is no fixed age at which a centrifuge control panel needs to be replaced. Some fifteen-year-old panels are still fully supportable and doing exactly what the plant needs. Some five-year-old panels are already a liability. Sentrimax evaluates an existing panel against four specific triggers rather than a calendar: obsolescence risk, spare-part availability, safety interlocks, and data capture.<\/p>\n<h2>Obsolescence Risk<\/h2>\n<p>A PLC or HMI platform becomes obsolete when the manufacturer discontinues the processor, communication modules, or programming software that keep it supportable. Obsolescence risk is not the same as failure. A discontinued PLC can run for years without a fault. The risk shows up the day it does fail, when the replacement part is no longer manufactured and the only options are a used unit of unknown history, a compatible substitute that needs re-engineering, or a full platform migration done under pressure instead of on a planned schedule.<\/p>\n<p>Checking obsolescence risk means confirming whether the PLC family, the HMI hardware, and the drive on the panel are still in active production, and if not, how deep the remaining spare-parts pool is.<\/p>\n<p>Obsolescence also compounds. A PLC nearing end of life is often paired with an HMI and a drive from the same era, so when one component becomes unsupportable the other two are frequently not far behind. Reviewing the panel as a system, rather than component by component as each one happens to fail, is what turns an obsolescence check into a useful planning input instead of a series of unrelated surprises.<\/p>\n<h2>Spare-Part Availability<\/h2>\n<p>Even a currently manufactured platform can have a thin spares situation for a specific model, especially communication cards, power supplies, and specialty I\/O modules. A panel that depends on a single sourced part with a long lead time carries real downtime risk even though nothing about the panel looks obsolete on paper. Sentrimax checks part availability as part of the panel inspection, separately from platform age, because the two do not always move together.<\/p>\n<p>The practical question worth asking is not just whether a part is available, but from how many sources, and how long the part would take to arrive if it failed tomorrow. A panel that depends on a single distributor for one critical module is more exposed than a panel built on a widely stocked platform, even if both panels are technically the same age.<\/p>\n<h2>Safety Interlocks<\/h2>\n<p>Interlocks are the logic that stops the centrifuge, or stops a specific action, under a defined unsafe condition: guard doors open, brake engaged, vibration past a setpoint, or a lockout signal active. Panels built to an older or lower safety standard, or built for a different process than the one now running through the machine, sometimes lack interlocks that a current plant safety program requires. A missing interlock is one of the few controls issues that should not wait for a convenient shutdown window.<\/p>\n<div class=\"sx-warn\">\n<h3>When an interlock gap is not optional<\/h3>\n<p>If an inspection finds the panel has no way to prevent bowl rotation with a guard open, or no confirmed way to stop on a vibration alarm, that is a safety finding to act on immediately, separate from any broader upgrade decision.<\/p>\n<\/div>\n<p>Interlock gaps often appear when a centrifuge is repurposed for a different process than it was originally installed to run, or moved from one part of a plant to another. The original panel may have been perfectly adequate for its first application and simply never updated to reflect a new one, which is why an interlock review is worth doing any time a machine&#8217;s duty changes, not only on a fixed schedule.<\/p>\n<h2>Data Capture<\/h2>\n<p>Older panels were built to run the process, not to record it. Many have no trending, no alarm history, and no way to export what happened before a trip. That is a real limitation for a reliability program that wants to correlate a bearing failure with the vibration trend that preceded it, or wants to prove out a process change with before-and-after data. A PLC and HMI upgrade can add trending, alarm logging, and export capability without changing anything about how the centrifuge itself runs.<\/p>\n<p>Data capture gaps are easy to underestimate because the centrifuge runs fine without them, right up until something fails and the team needs to reconstruct what led up to it. Without a trend history, that reconstruction relies on operator memory and whatever alarm annunciated at the moment of the trip, which is rarely enough to build a confident root cause. Plants that have been burned by this once tend to treat data capture as a priority on every subsequent panel decision.<\/p>\n<div class=\"sx-table-wrap\">\n<table class=\"sx-table\">\n<thead>\n<tr>\n<th>Trigger<\/th>\n<th>What it looks like<\/th>\n<th>Why it matters<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Obsolescence risk<\/td>\n<td>PLC, HMI or drive platform discontinued<\/td>\n<td>Failure becomes a platform migration done under pressure<\/td>\n<\/tr>\n<tr>\n<td>Spare-part availability<\/td>\n<td>Long lead times on specific modules or cards<\/td>\n<td>Downtime risk independent of platform age<\/td>\n<\/tr>\n<tr>\n<td>Safety interlocks<\/td>\n<td>Missing or outdated guard, brake or vibration interlocks<\/td>\n<td>Direct safety exposure, not just a reliability issue<\/td>\n<\/tr>\n<tr>\n<td>Data capture<\/td>\n<td>No trending, alarm history or export capability<\/td>\n<td>Limits root-cause analysis and reliability tracking<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h2>What an ETL-Certified Panel Upgrade Involves<\/h2>\n<p>Where an upgrade is warranted, Sentrimax scopes it around the four triggers found during inspection: a straight PLC and HMI platform migration, an added or corrected set of interlocks, new data logging capability, or a full panel rebuild carrying ETL certification for electrical safety compliance. Drive faults are evaluated as part of the same inspection, since a struggling VFD is frequently mistaken for a mechanical problem; <a href=\"\/fr\/centrifuge-vfd-troubleshooting\/\">why centrifuge VFDs fail and how to tell a drive fault from a mechanical one<\/a> covers that distinction in more depth. The broader controls and automation capability, including PLC programming, HMI design and brake system integration, is described on the <a href=\"\/fr\/centrifuge-controls-automation\/\">centrifuge controls and automation<\/a> page.<\/p>\n<h2>When the Answer Is Not to Upgrade<\/h2>\n<p>If a panel passes on all four triggers, meaning parts are available, interlocks are current, and the plant is getting the data it needs, an upgrade is a discretionary project rather than a necessary one. Spending the budget on a mechanical overhaul or on addressing a diagnosed fault is usually the better use of it. Sentrimax&#8217;s inspection is built to give a plant that answer honestly rather than defaulting to a recommendation to replace.<\/p>\n<h2>What Waiting Actually Costs<\/h2>\n<p>Deferring a panel that genuinely needs attention does not make the underlying risk go away, it just moves the timing of when that risk becomes a problem out of the plant&#8217;s control. An obsolete platform that fails on a Tuesday afternoon forces a rushed decision under production pressure, usually at a worse price and a worse lead time than the same decision made on a planned schedule. A missing interlock that goes unaddressed carries that same exposure every single day the machine runs, regardless of how many of those days pass without incident. None of this means every aging panel needs to be replaced immediately; it means the decision to wait should be made deliberately, with the four triggers evaluated, rather than by default because nothing has failed yet.<\/p>\n<h2>Documentation Worth Keeping<\/h2>\n<p>Whatever a plant decides, keeping a current record of the panel&#8217;s condition pays off the next time a decision has to be made. That means the PLC program file if one exists, a photo of the panel nameplate and interior, a note of any parameter changes made during other work, and the findings from the most recent controls inspection. A plant that has this on hand can get a much faster read on obsolescence and parts risk the next time the question comes up, instead of starting the investigation from scratch.<\/p>\n<h2>Controls and Mechanical Condition Are Evaluated Together<\/h2>\n<p>A control panel upgrade rarely happens in isolation from the mechanical condition of the machine it runs. If the centrifuge is also due for a rotating-assembly inspection, that is generally scoped alongside the panel work; see <a href=\"\/fr\/decanter-centrifuge-repair\/\">decanter centrifuge repair and overhaul<\/a> for what that inspection covers. And if the reason for the panel review was an unexplained fault rather than a planned upgrade, <a href=\"\/fr\/centrifuge-troubleshooting\/\">general centrifuge troubleshooting<\/a> is the starting point for narrowing down whether the fault is electrical, mechanical, or both.<\/p>\n<h2>Getting a Panel Evaluated<\/h2>\n<p>Send photos of the panel nameplate, the interior wiring, and the HMI screen, along with a description of the fault or the reason for the review. Sentrimax can give an initial read on obsolescence and parts risk from that alone, before any equipment ships.<\/p>\n<h2>How This Applies Across a Mixed Fleet<\/h2>\n<p>Plants running centrifuges from several different manufacturers often find the panel condition varies more by installation date than by brand. A ten-year-old panel on one brand and a ten-year-old panel on another can share the same PLC family and the same obsolescence exposure, simply because both were built by the same integrator around the same time. Evaluating panels against the four triggers, rather than assuming brand determines panel quality, gives a more accurate picture across a fleet with mixed nameplates; see <a href=\"\/fr\/centrifuge-brands-serviced\/\">les marques et mod\u00e8les des services Sentrimax<\/a> for the full range of equipment this applies to.<\/p>\n<section class=\"sx-faq\">\n<h2>Foire aux questions<\/h2>\n<details>\n<summary>Can a control panel be upgraded without shipping the whole centrifuge?<\/summary>\n<div class=\"sx-faq-a\">\n<p>In many cases, yes. If the panel can be safely disconnected and shipped, or if the work can be scoped from photos, documentation and a site visit, a panel upgrade does not always require sending the mechanical machine along with it. Whether that is possible depends on the specific installation.<\/p>\n<\/div>\n<\/details>\n<details>\n<summary>How do I know if my PLC platform is obsolete?<\/summary>\n<div class=\"sx-faq-a\">\n<p>The clearest signs are a discontinued processor model, programming software no longer sold or updated, and communication modules that are only available used. Sentrimax can confirm platform status from the PLC nameplate and, where available, the program file version during an inspection.<\/p>\n<\/div>\n<\/details>\n<details>\n<summary>Does an ETL-certified panel replace the need for interlocks specific to my process?<\/summary>\n<div class=\"sx-faq-a\">\n<p>No. ETL certification confirms the panel&#039;s electrical construction meets recognized safety standards. It does not substitute for process-specific interlocks your plant requires, such as a guard interlock or a specific alarm response, which have to be engineered into the panel logic separately.<\/p>\n<\/div>\n<\/details>\n<details>\n<summary>What happens to the existing control logic during a PLC migration?<\/summary>\n<div class=\"sx-faq-a\">\n<p>The existing logic is reviewed, and where the original program can be recovered, it is rebuilt on the new platform rather than started from scratch, preserving the sequencing and interlocks that already work. Where the program is missing or undocumented, the logic is reconstructed from how the machine actually operates.<\/p>\n<\/div>\n<\/details>\n<details>\n<summary>Can a panel upgrade be scheduled around a planned outage?<\/summary>\n<div class=\"sx-faq-a\">\n<p>Yes. Because a panel upgrade is electrical work rather than a teardown of the rotating assembly, it is often scheduled to align with a planned shutdown, a mechanical overhaul, or another window when the centrifuge is already out of service.<\/p>\n<\/div>\n<\/details>\n<\/section>\n<section class=\"sx-cta\">\n<h2>Parlez \u00e0 un sp\u00e9cialiste des centrifugeuses<\/h2>\n<p>Envoyez-nous les d\u00e9tails de la machine et nous vous ferons parvenir un devis et une description du p\u00e9rim\u00e8tre d&#039;inspection.<\/p>\n<p><a class=\"sx-btn\" href=\"\/fr\/centrifuge-controls-automation\/\">Scope a control panel upgrade<\/a><\/section>\n<\/div>\n<p><!-- SX-AIU:END --><\/p>","protected":false},"excerpt":{"rendered":"<p>Upgrade a centrifuge control panel when the PLC or HMI platform is obsolete, replacement parts are hard to source, the panel lacks safety interlocks a current process needs, or it cannot capture the process data your team relies on. Sentrimax evaluates existing panels against these four triggers before recommending a PLC, HMI or VFD upgrade.<\/p>","protected":false},"author":10,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"class_list":["post-3029","page","type-page","status-publish","hentry"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.1.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Obsolescence, parts availability, safety interlocks and data capture drive a centrifuge control panel upgrade. See how Sentrimax evaluates each trigger.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/sentrimax.com\/fr\/centrifuge-control-panel-upgrade\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"fr_FR\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Sentrimax Centrifuges -\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Centrifuge Control Panel Upgrade Triggers | Sentrimax\" \/>\n\t\t<meta property=\"og:description\" content=\"Obsolescence, parts availability, safety interlocks and data capture drive a centrifuge control panel upgrade. See how Sentrimax evaluates each trigger.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/sentrimax.com\/fr\/centrifuge-control-panel-upgrade\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/sentrimax.com\/wp-content\/uploads\/2025\/05\/Group-1-1.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/sentrimax.com\/wp-content\/uploads\/2025\/05\/Group-1-1.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"384\" \/>\n\t\t<meta property=\"og:image:height\" content=\"128\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-09-12T00:24:02+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-09-12T00:24:02+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Centrifuge Control Panel Upgrade Triggers | Sentrimax\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Obsolescence, parts availability, safety interlocks and data capture drive a centrifuge control panel upgrade. See how Sentrimax evaluates each trigger.\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/sentrimax.com\/wp-content\/uploads\/2025\/05\/Group-1-1.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/fr\\\/centrifuge-control-panel-upgrade\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/fr#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/sentrimax.com\\\/fr\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/fr\\\/centrifuge-control-panel-upgrade\\\/#listItem\",\"name\":\"When Should a Centrifuge Control Panel Be Upgraded?\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/fr\\\/centrifuge-control-panel-upgrade\\\/#listItem\",\"position\":2,\"name\":\"When Should a Centrifuge Control Panel Be Upgraded?\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/fr#listItem\",\"name\":\"Home\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/fr\\\/#organization\",\"name\":\"Sentrimax Centrifuges\",\"url\":\"https:\\\/\\\/sentrimax.com\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/sentrimax.com\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/Group-1-1.png\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/fr\\\/centrifuge-control-panel-upgrade\\\/#organizationLogo\",\"width\":384,\"height\":128},\"image\":{\"@id\":\"https:\\\/\\\/sentrimax.com\\\/fr\\\/centrifuge-control-panel-upgrade\\\/#organizationLogo\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/fr\\\/centrifuge-control-panel-upgrade\\\/#webpage\",\"url\":\"https:\\\/\\\/sentrimax.com\\\/fr\\\/centrifuge-control-panel-upgrade\\\/\",\"name\":\"Centrifuge Control Panel Upgrade Triggers | Sentrimax\",\"description\":\"Obsolescence, parts availability, safety interlocks and data capture drive a centrifuge control panel upgrade. See how Sentrimax evaluates each trigger.\",\"inLanguage\":\"fr-FR\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/sentrimax.com\\\/fr\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/sentrimax.com\\\/fr\\\/centrifuge-control-panel-upgrade\\\/#breadcrumblist\"},\"datePublished\":\"2026-09-12T00:24:02+00:00\",\"dateModified\":\"2026-09-12T00:24:02+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/sentrimax.com\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/sentrimax.com\\\/fr\\\/\",\"name\":\"Sentrimax Centrifuges\",\"inLanguage\":\"fr-FR\",\"publisher\":{\"@id\":\"https:\\\/\\\/sentrimax.com\\\/fr\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Centrifuge Control Panel Upgrade Triggers | Sentrimax","description":"Obsolescence, parts availability, safety interlocks and data capture drive a centrifuge control panel upgrade. See how Sentrimax evaluates each trigger.","canonical_url":"https:\/\/sentrimax.com\/fr\/centrifuge-control-panel-upgrade\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BreadcrumbList","@id":"https:\/\/sentrimax.com\/fr\/centrifuge-control-panel-upgrade\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/sentrimax.com\/fr#listItem","position":1,"name":"Home","item":"https:\/\/sentrimax.com\/fr","nextItem":{"@type":"ListItem","@id":"https:\/\/sentrimax.com\/fr\/centrifuge-control-panel-upgrade\/#listItem","name":"When Should a Centrifuge Control Panel Be Upgraded?"}},{"@type":"ListItem","@id":"https:\/\/sentrimax.com\/fr\/centrifuge-control-panel-upgrade\/#listItem","position":2,"name":"When Should a Centrifuge Control Panel Be Upgraded?","previousItem":{"@type":"ListItem","@id":"https:\/\/sentrimax.com\/fr#listItem","name":"Home"}}]},{"@type":"Organization","@id":"https:\/\/sentrimax.com\/fr\/#organization","name":"Sentrimax Centrifuges","url":"https:\/\/sentrimax.com\/fr\/","logo":{"@type":"ImageObject","url":"https:\/\/sentrimax.com\/wp-content\/uploads\/2025\/05\/Group-1-1.png","@id":"https:\/\/sentrimax.com\/fr\/centrifuge-control-panel-upgrade\/#organizationLogo","width":384,"height":128},"image":{"@id":"https:\/\/sentrimax.com\/fr\/centrifuge-control-panel-upgrade\/#organizationLogo"}},{"@type":"WebPage","@id":"https:\/\/sentrimax.com\/fr\/centrifuge-control-panel-upgrade\/#webpage","url":"https:\/\/sentrimax.com\/fr\/centrifuge-control-panel-upgrade\/","name":"Centrifuge Control Panel Upgrade Triggers | Sentrimax","description":"Obsolescence, parts availability, safety interlocks and data capture drive a centrifuge control panel upgrade. See how Sentrimax evaluates each trigger.","inLanguage":"fr-FR","isPartOf":{"@id":"https:\/\/sentrimax.com\/fr\/#website"},"breadcrumb":{"@id":"https:\/\/sentrimax.com\/fr\/centrifuge-control-panel-upgrade\/#breadcrumblist"},"datePublished":"2026-09-12T00:24:02+00:00","dateModified":"2026-09-12T00:24:02+00:00"},{"@type":"WebSite","@id":"https:\/\/sentrimax.com\/fr\/#website","url":"https:\/\/sentrimax.com\/fr\/","name":"Sentrimax Centrifuges","inLanguage":"fr-FR","publisher":{"@id":"https:\/\/sentrimax.com\/fr\/#organization"}}]},"og:locale":"fr_FR","og:site_name":"Sentrimax Centrifuges -","og:type":"article","og:title":"Centrifuge Control Panel Upgrade Triggers | Sentrimax","og:description":"Obsolescence, parts availability, safety interlocks and data capture drive a centrifuge control panel upgrade. See how Sentrimax evaluates each trigger.","og:url":"https:\/\/sentrimax.com\/fr\/centrifuge-control-panel-upgrade\/","og:image":"https:\/\/sentrimax.com\/wp-content\/uploads\/2025\/05\/Group-1-1.png","og:image:secure_url":"https:\/\/sentrimax.com\/wp-content\/uploads\/2025\/05\/Group-1-1.png","og:image:width":384,"og:image:height":128,"article:published_time":"2026-09-12T00:24:02+00:00","article:modified_time":"2026-09-12T00:24:02+00:00","twitter:card":"summary_large_image","twitter:title":"Centrifuge Control Panel Upgrade Triggers | Sentrimax","twitter:description":"Obsolescence, parts availability, safety interlocks and data capture drive a centrifuge control panel upgrade. See how Sentrimax evaluates each trigger.","twitter:image":"https:\/\/sentrimax.com\/wp-content\/uploads\/2025\/05\/Group-1-1.png"},"aioseo_meta_data":{"post_id":"3029","title":"Centrifuge Control Panel Upgrade Triggers | Sentrimax","description":"Obsolescence, parts availability, safety interlocks and data capture drive a centrifuge control panel upgrade. See how Sentrimax evaluates each trigger.","keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":null,"twitter_description":null,"schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"WebPage","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null,"created":"2026-09-12 00:24:02","updated":"2026-09-12 00:32:30","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/sentrimax.com\/fr\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tWhen Should a Centrifuge Control Panel Be Upgraded?\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/sentrimax.com\/fr"},{"label":"When Should a Centrifuge Control Panel Be Upgraded?","link":"https:\/\/sentrimax.com\/fr\/centrifuge-control-panel-upgrade\/"}],"_links":{"self":[{"href":"https:\/\/sentrimax.com\/fr\/wp-json\/wp\/v2\/pages\/3029","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sentrimax.com\/fr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/sentrimax.com\/fr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/sentrimax.com\/fr\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/sentrimax.com\/fr\/wp-json\/wp\/v2\/comments?post=3029"}],"version-history":[{"count":0,"href":"https:\/\/sentrimax.com\/fr\/wp-json\/wp\/v2\/pages\/3029\/revisions"}],"wp:attachment":[{"href":"https:\/\/sentrimax.com\/fr\/wp-json\/wp\/v2\/media?parent=3029"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}