A full centrifuge overhaul is a complete teardown, inspection and rebuild of a decanter or tricanter centrifuge covering the rotating assembly, bearings, seals, wear surfaces and balance, machined and reassembled to OEM tolerances. Sentrimax performs full overhauls under a documented ISO 9001:2015 process ending in a full test run and performance report.

What Separates a Full Overhaul from a Repair or a Refurbishment

Getting this distinction right at the outset avoids the two most common ways a repair budget goes sideways: paying repeatedly for narrow fixes on a machine that actually needed a full teardown, or paying for a complete rebuild when a single targeted repair would have returned the unit to reliable service.

A repair is targeted: it fixes one identified fault and leaves the rest of the machine alone. A refurbishment restores an idle or surplus unit to a serviceable condition for its next role, often without reworking every internal tolerance. A full overhaul is neither. It is a complete teardown of the rotating assembly, a dimensional inspection of every critical fit against OEM tolerances, and a rebuild that corrects everything the inspection finds worn – not only the item that prompted the call. The distinction matters because it changes what should be in scope before a quote is approved. The Revisión y reconstrucción de la centrífuga hub covers how Sentrimax draws that line across all three categories of work.

A full overhaul tends to come up in a few recognizable situations: after a major failure has already damaged more than one part of the assembly, ahead of a planned plant turnaround where the goal is to avoid an unplanned outage later in the year, or when a unit is being brought back into frontline service after sitting in a lightly used or standby role. In each case, the common thread is that the machine’s condition needs to be re-established from a known baseline rather than assumed, which is exactly what the teardown and inspection are for.

What Gets Inspected and Restored

A full overhaul works through the entire rotating assembly and its supporting components, not just the part that failed. The checklist below reflects what a teardown-to-test-run scope typically covers, and it is the same checklist regardless of which brand of centrifuge is on the shop floor, since Sentrimax is an independent provider applying one documented process across Sharples, Flottweg, Centrisys, Derrick, GEA, Alfa Laval, Tomoe, Andritz, Bird, Pieralisi and other equipment rather than a different standard for each.

  • Full disassembly of the rotating assembly for inspection, rather than spot-checking around a known fault
  • Measurement of every critical precision fit against OEM tolerances
  • Steam cleaning and polishing of critical surfaces so wear and damage can be properly assessed
  • Bearing condition and clearance evaluation
  • Seal condition and fit
  • Wear surfaces on wetted components, rebuilt where appropriate rather than defaulting straight to new castings
  • Dynamic balancing of the reassembled rotating assembly to ISO G 0.5
  • A full test run with a performance report before the unit ships

The Three-Stage Process, Applied to a Full Overhaul

Sentrimax runs every overhaul through the same documented ISO 9001:2015 process. For a full overhaul, the repair stage is where the bulk of the restoration work happens.

  1. Inspección y presupuesto. The centrifuge is documented, ID-tagged and disassembled. Oil samples go out for third-party analysis, a licensed technician completes a 75-point inspection, and every critical precision fit is measured and photographed. The findings become a quotation package: inspection report, scope of work, required parts, pricing and an estimated delivery time.
  2. Reparar. Approved work proceeds with a parts package meeting or exceeding OEM specifications, required welding, machining of repaired parts to OEM tolerances, full reassembly, and balancing to ISO G 0.5. A technician then completes a detailed post-repair quality control inspection.
  3. Test run and delivery. The rebuilt unit undergoes a complete test run with a performance report, then ships through a dedicated broker network with a detailed invoice covering parts, labor and completed analyses, plus shipping confirmation and tracking.

When a Full Overhaul Is the Right Call Versus a Targeted Repair

A full overhaul is usually warranted when a machine is approaching the end of a planned interval, when oil analysis and vibration trends point to broad wear rather than a single failed component, or when a major failure has already damaged multiple parts of the assembly. ¿Con qué frecuencia se debe revisar una centrífuga decantadora? covers the specific signals – duty cycle, feed abrasiveness, oil analysis trend and vibration history – that should drive that decision rather than a fixed date.

Rebuilding Wear Surfaces as Part of the Overhaul

Abrasive feed wears the interior of a rotating assembly long before the part itself is structurally unusable. Rather than replacing a worn component outright, a full overhaul can rebuild those surfaces with hard surfacing weld overlay, HVOF thermal spray coating, or tile replacement, depending on the wear pattern and the base material. Recubrimiento de superficies duras y recubrimiento HVOF en una centrífuga. compares the three methods in detail.

Parts Sourced or Machined for a Full Overhaul

A full overhaul draws on more than one Sentrimax capability at once. The parts package assembled for the rebuild is required to meet or exceed OEM specifications, whether that means new stock parts, components machined in-house to OEM tolerance, or – for older or discontinued models – parts reverse-engineered from the worn original. Welding and fabrication capability, including MIG, TIG and laser welding, brazing, HVOF coatings and hard surfacing, is applied where wear surfaces need rebuilding rather than outright replacement. None of this is scoped in isolation; it is decided from the single inspection record produced in Stage 1, so the parts package, welding scope and machining requirements are all consistent with the same set of measurements.

Why Every Overhaul Ends With Balancing and a Test Run

Machining and reassembly alone do not guarantee a rotating assembly will run smoothly. Balance is checked and corrected through three-plane balancing to ISO G 0.5 specifications after reassembly, which is the same standard applied across every Sentrimax repair and overhaul rather than a tier reserved for premium jobs. The finished unit is then put through a full test run with a performance report before it ships, so the documentation reflects how the machine actually ran on the test stand, not only how it measured on the bench.

Equipment Scope

Full overhauls are performed on decanter, tricanter and disc stack centrifuges from 8 to 43 inches in bowl diameter, across brands including Sharples, Flottweg, Centrisys, Derrick, GEA, Alfa Laval, Tomoe, Andritz, Bird and Pieralisi. Where original parts are no longer manufactured, Sentrimax’s engineering and machine shop can design new components or reverse-engineer replacements to OEM tolerance so the overhaul is not held up by a discontinued part number.

Inspection standard
Licensed technician, 75-point inspection, critical fits measured
Análisis de aceite
Samples sent for third-party laboratory analysis
Estándar de equilibrio
Equilibrado en tres planos según ISO G 0.5
Final verification
Quality control inspection plus a full test run with performance report

Before you approve a full overhaul

Ask for the inspection report and scope of work, not just a price. The 75-point inspection and precision-fit measurements taken in Stage 1 are what determine whether a full overhaul is actually justified, or whether a narrower repair will do the job.

What Happens While the Unit Is Out for Overhaul

Because a full overhaul is a planned, multi-stage job rather than a quick turnaround repair, it is worth thinking about the process it supports, not just the machine itself. A rental centrifuge can keep a line running while the original unit is torn down, inspected, repaired and tested, and mobilization options such as skid or trailer mounting can be arranged if the overhauled unit is going back into a different physical location than it came from. Neither of these has to be decided at the same moment as the overhaul scope, but both are worth raising during the Stage 1 inspection conversation rather than after the unit has already shipped.

The delivery stage is also where a lot of the practical planning happens. Sentrimax ships completed work through a dedicated broker network, with a detailed invoice covering parts, labor and completed analyses, plus shipping confirmation and tracking. For a plant coordinating a reinstallation date around the return of an overhauled unit, having that tracking information early is often as useful operationally as the technical scope of the overhaul itself.

Scoping a Full Overhaul

The only reliable way to scope a full overhaul is to have the unit inspected first. That inspection produces the documentation needed to decide what should be repaired, machined or rebuilt, and what can be left alone. Because Sentrimax is an independent service provider rather than tied to a single manufacturer, that inspection and the resulting scope are based on what the machine’s own measurements show, not on a manufacturer’s incentive to sell a new unit instead of restoring the one already on site. That independence applies across every brand serviced, from current production models to legacy units whose original manufacturer may no longer offer support at all.

Preguntas frecuentes

How long does a full centrifuge overhaul take?

Timelines depend on what the inspection finds, parts availability and the specific machine, so Sentrimax provides an estimated delivery time as part of the quotation package after inspection rather than a fixed promise up front.

Does a full overhaul always include new bearings and seals?

Bearings and seals are evaluated during the inspection and replaced where the findings call for it. A full overhaul is scoped around what the teardown and measurements actually show, not a fixed parts list applied to every unit.

Can the rotor or bowl be repaired instead of replaced during a full overhaul?

In many cases, yes. Worn wetted surfaces can often be rebuilt with hard surfacing, HVOF coating or tile replacement rather than being replaced outright, depending on the extent and pattern of the wear found at inspection.

What documentation comes back with a fully overhauled centrifuge?

The delivered unit is accompanied by the inspection report, scope of work, a post-repair quality control inspection record, a full test run performance report, and an invoice detailing all parts, labor and completed analyses.

Is a full overhaul the same thing as buying a refurbished centrifuge?

No. A refurbished unit is typically idle or surplus equipment restored to a serviceable standard for resale or a spare role. A full overhaul rebuilds your own machine to OEM tolerances through a documented inspection, repair and test-run process.

Hable con un especialista en centrífugas.

Envíenos los detalles de la máquina y le enviaremos un informe de inspección y un presupuesto.

Scope a full overhaul

Antes de irte…

¿Necesita ayuda con la reparación, el mantenimiento o el repuesto de su centrífuga?

Explore los recursos más relevantes para sus instalaciones.