Our process
- Home
- Our process
Our Process
Sentrimax actively maintains an ISO 9001:2015 certification, a global benchmark for quality control management. We will do the job right, with precision and speed, to minimize downtime for our customers.
01
Once we receive your centrifuge, we will provide a thorough inspection and detailed, transparent job quote.
- Document and ID tag your equipment for triage
- Take oil samples and send for 3rd party analysis
- Disassembly and comprehensive inspection
- Prepare rotating assembly for inspection, including full steam clean and polishing of critical surfaces
- Licensed technician completes a 75-point inspection
- Measure all critical precision fits
- Take detailed and annotated photos of full machine and parts
- Prepare quotation package – includes full inspection report, scope of work, required parts, pictures, pricing and estimated delivery time
02
Once approved, we’ll begin working on your equipment right away.
- Parts assembly – assemble required parts package which meets or exceeds OEM-specifications
- Welding – preform all required welding repairs and / or procedures
- Machining – machine all repaired parts to meet OEM tolerances
- Balancing – perform full balancing up to ISO G 0.5 specifications
- Re-assembly – re-assemble all required components for the full centrifuge
- Quality Control Inspection – technician completes detailed post-repair inspection
- Test Run – full test run including performance report
03
Once complete and tested, we will load your centrifuge for delivery.
- We offer shipping services through our dedicated broker network
- Invoice will include a detailed report of all parts, labor and other completed analyses
- Shipping confirmation and tracking